










Make A Donation
to SLWS
| |
Discovery
RENOVATION
PHOTOGRAPHS - 1993

March 1993 - The new grey deck paint. The white was done later
Back to top of page

I
enclosed and sealed the compartment with aluminium panels
the covered with specially designed sound insulation
material, designed for such installations on the sides
and top (top after this picture was taken). |
May 1993
- The engine compartment. The engine was out being
serviced & cleaned at this point.
Previously there was nothing between the engine and the
inside except the rather insufficient bulkhead midships. |
The
compartment still had adequate ventilation through it's pre-existing
port & starboard vents. All this reduced the engine
noise throughout the boat and eliminated any risk of
escaping fumes getting into the boat. |
Sorry the
picture is in black & white, I was feeling a bit
"off colour" :)
Back to top of page |

August
1993 - The original helm. This shows my some-what unusual
framework.
I used a galvanised steel frame because I thought it
would be the strongest and easiest material for me to
work with. You might argue that it would be too heavy, but
far from it - when completed I tested it and found that
Discovery can tip to over 45degrees from vertical and
still easily right herself. |
You'll
also see the custom cut hardwood beam across in front of
the helm position, this is ready for the new cockpit
windows. |
 
Copyright 2003
|